Portfolio

Prisma Tower

High-rise building of 27,600 m² installation of a bridge on the BMS Schneider Energy performance services Contract with Savings Guarantees Savings made in 2022: €221,000, 38% of the bill Return on investment time:

Meudon Campus

Customer : BNP REPM Facility manager : Energilec Location : Meudon – France Area : 45 000 m² Starting of service : 2010 Garanteed energy savings.

13 logistic platforms – AEW

Customer : AEW Europe Property managers : Icade / BNP Paribas / GSA Location : France 13 platforms : 411 500 m² Starting of service : 2012
  • Optimized remote supervision of heating systems
  • Calculation of savings
Garanteed energy savings

3 logistics platforms – BNP REPM

Customer : BNP REPM Location : France 3 logistics platforms : 105 000 m² Starting of service : 2009 Optimized remote supervision of HVAC systems and energy consumption.

2 logistics platforms – Logiforce

Customer : Logiforce - Constructa Location : France 2 logistics platforms : 120 000 m² Starting of service : 2010 Optimized remote supervision of HVAC systems and energy consumption. 2012-13 energy savings for St-Germain-lès-Arpajon platform :         45 500 € (30% of the bill). Return of investment of less than 1 year.

Roissy-en-Brie platform – Argan

Customer : Argan Property manager : Argan Location : France – Roissy-en-Brie 1 logistic platform : 36 000 m² Starting of service : 2009 Optimized remote supervision of HVAC systems and energy consumption. Energy savings per year :         75 000 € to 111 000 € (40% to 60 % of the bill). Return of investment of less than 1 year.

2 logistics platforms – Gazeley

Customer : Gazeley Property manager : Dauchez-Payet Location : France 2 logistics platforms : 47 200 m² Starting of service : 2011 Optimized remote supervision of HVAC systems and energy consumption. Energy savings per year for Gondreville platform :         28 500 € (53 % of the bill). Return of investment of less than 1 year.

3 logistics platforms – Cogestra

Customer: Cogestra  Location : France 3 logistics platforms : 95 000 m² Starting of service : 2010 Optimized remote supervision of HVAC systems and energy consumption.

Mitry Mory platform – Prologis

Location : France – Mitry Mory Customer : Prologis 1 logistic platform : 27 000 m² Starting of service : 2011
  • Energy management (optimized remote control of pumps).
  • Optimized remote supervision of HVAC systems.
2012 energy savings : 44 750 € (52 % of the bill) Return of investment of less than 1 year
At the request of Prologis, Ergelis also conducts energy audits with forecast of energy consumption for benchmarking of logistic platforms.

Shopping mall « Issy 3 Moulins »

Customer : Corio Location : France – Issy-les-Moulineaux Gross leasable area : 30 000 m² Renovation of the building management system TREND.

Shopping mall « Caen Mondeville 2 »

Customer : Klepierre Location : France – Caen Gross leasable area: 60 000 m² Renovation and maintenance of the building management system.

Shopping mall « Quai d’Ivry »

Customer : Carrefour Location : France – Ivry-sur-Seine GLA : 60 000 m² Starting of service : 2011
  • Building management system (HVAC, lighting, counting, alarms)
  • Energy management
  • Guarantee on achieved savings
Energy savings : 80 000 € (25 % of the bill) Return of investment less than 2 years

16 Metro Cash and Carry retail outlets

Customer: Metro Cash and Carry Location: France 16 outlets : 143 460 m² Starting of service : 2006 BMS installation, maintenance and technical / energy assistance

34 DIY stores

Location : France 34 outlets : 153 000 m² Starting of service : 2008 Optimized remote supervision of heating systems
Energy savings achieved per year : 120 000 €

Technip Tower – La Defense

Customer : Technip Area : 55.000 m² Installation of a remote management system on top of the existing Carrier BMS Energy performance services Contract with energy saving guarantee Savings measured over a 3 years period (2010-2012) :     380 000 € (10 % of total bill) Return of investment of 2 years.

Quadrium building

Customer : Altys, for CBRE Area : 14.000 m² Renovation of Siemens - Landis BMS Energy information on TV screens

Office building 32Blanche – Paris

Customer : Nexity Owner : Carlyle 22000 m² prestigious building, with strong visibility on the Paris market, fully renovated with environmental certifications Installation of a remote management system on top of the Kieback & Peter BMS Control of maintenance and energy consumptions Reporting

8 Toys R Us stores

Customer : Toys R Us France Location : France
8 stores :  20 000 m²
  • Simplified BMS system interfaced to major installations
  • Remote monitoring of equipements  and energy consumptions
  • Assistance to local people allowing rapid problems solving and decrease in maintennace costs

Notre Adresse

Ergelis
2 rue Ambroise Croizat,
91120 Palaiseau, France.
Tél : +33.1.87.59.07.40

Contactez-Nous





    captcha

    Our Address

    Ergelis
    2 rue Ambroise Croizat,
    91120 Palaiseau, France.
    Tél : +33.1.87.59.07.40

    Contact us





      captcha

      Scroll to Top